Eliminate the Cliffs in Your QMS
How to design processes that scale with risk instead of creating compliance bottlenecks
In last week’s post, we discussed the effect of regulatory cliffs—step changes in regulatory burden—and how they can distort innovation. In particular, under the 510(k) process in the US, there is a strong incentive to downplay the novelty of innovations to ensure that substantial equivalence with a predicate can be claimed. This shifts the focus from developing and verifying the product in a way that best and most safely serves patient needs, to defining a product and the minimal (clinical) evidence needed for release via the chosen regulatory pathway. This resulted in spirited discussions in the comment section. In a sense, this was somewhat surprising, since there is little that most companies can do about the regulatory rules under which they operate.
In this week’s article, we discuss how similar “cliffs” can play a role within a company’s QMS, and how they can lead to team frustration, wasted effort spent staying below artificial thresholds, and ultimately non-conformities and potential patient risks. In contrast to external regulatory frameworks, however, you dohave control over your QMS. We argue that you can and often should, eliminate these artificial steps by designing processes that are as simple as possible, while still allowing proper scaling in line with actual risk and impact.
In this article, we discuss three processes that every MedTech company needs to have: supplier management, change management, and software tool validation. Based on our experience across organizations of different sizes and maturity levels, we have seen many cases where these processes were not functioning optimally, resulting in both wasted effort and compliance issues. We provide examples of how overly heavy and rigid processes lead teams to look for loopholes, often resulting in the downplaying of potential impacts and, ultimately, non-conformities.
Risk-based and appropriate
ISO 13485:2016 is widely recognized, both under the EU MDR and now the FDA, as the state of the art for medical device QMS development. The standard requires in clause 4.1.2(b) that companies apply a “risk based approach” to the control of QMS processes. Terms such as “as appropriate” and “proportionate to the risk” are used throughout the standard to enable companies to define processes aligned with the risk profile of their products and the size and scope of the organization.
This also means that a QMS cannot simply be copied from one company to another. It will always need to be adapted to fit the organization and must evolve as the organization grows.
One might argue that using a QMS designed for higher-risk products or a more complex organization should also work for smaller or lower-risk companies. In practice, however, this often leads to bloated procedures that are not followed. At best, this results in non-conformities against the company’s own QMS. At worst, it can introduce actual patient risks.
Supplier Management
Companies need a process to ensure that suppliers delivering products and services meet the requirements of the specified purchasing information. Clause 7.4.1 specifies that the process must take into account “(c) the effect of the purchased product on the quality of the medical device” and be “(d) proportionate to the risk associated with the medical device“.
The standard does not require companies to define rigid buckets (e.g., “critical” or “high-risk” suppliers) that automatically trigger mandatory control measures (with one exception: outsourced processes always require a written quality agreement under clause 4.1.5). Introducing these artificial classifications can create unnecessary friction.
Recently, we worked with a small startup that had defined three risk levels (low, medium, high) and four product types (Finished Product, Component/Assembly, Services, and Consultancy), with a matrix specifying whether audits or quality agreements were mandatory. In practice, even low- and medium-risk suppliers often required audits and quality agreements. Teams struggled to classify suppliers, as the required controls frequently felt excessive.
Combined with a process requiring multiple forms for evaluation and qualification, the system became so cumbersome that it was simply not followed. This was exacerbated by resource constraints and the requirement that audits be conducted by the Quality Manager. As a result, despite working with suppliers throughout development, none had been formally qualified; leading to a major non-conformity during the stage 2 audit.
Our preferred approach is a simple procedure outlining relevant risk factors and potential control measures. This is combined with a single record per supplier that describes the purchased products or services, their potential impact on product quality, and the selected control measures (e.g., QMS certificate checks, incoming inspection, audits, quality agreements). Evidence is referenced directly in the same record.
This approach allows the level of effort to scale with risk. For low-risk suppliers, qualification can be completed within an hour, significantly lowering the barrier to compliance.
For another client where this approach is fully implemented, teams themselves now complete supplier qualifications. Due to the reduced overhead, compliance has improved significantly. This not only prevents non-conformities but also improves actual control, as teams actively consider and mitigate supplier risks earlier.
Product Change Management
Any change to a medical device must be managed in line with clause 7.3.9, which requires consideration of “the significance of the change to function, performance, usability, safety and applicable regulatory requirements.”Changes must be reviewed, verified and validated (as appropriate), and approved before implementation.
This is a critical process to ensure continued safety and performance throughout the device lifecycle. It must therefore be well embedded in the organization and applied consistently. If the process is too complex or cumbersome, teams may ignore smaller changes or bundle unrelated changes into a single request. Conversely, an efficient process enables rapid and controlled updates.

One of our clients develops a software product delivered pre-installed on off-the-shelf computers with varying network configurations. The team explored separating “software releases” from “configuration releases” to avoid re-releasing software for configuration changes. This led to complex discussions about deferred requirements and how to handle aspects such as instructions for use which might have to be updated for new configurations.
Ultimately, it became clear that software testing always requires a baseline configuration to enable integration testing and proper risk management, particularly for cybersecurity controls implemented during system setup. In essence, the team was creating two parallel processes, introducing unnecessary friction and debate about scope and responsibilities. However, their existing change process already provided sufficient flexibility. For example, adding a new PC configuration could be handled through a standard change request: only relevant compatibility tests would need to be repeated, and production instructions updated accordingly. All of this could be documented and signed off within the existing process.
For smaller organizations, the change process can be a concise procedure describing key evaluation factors and criteria for regulatory notifications (e.g., new 510(k) or Notified Body notification). A single form with clear factors to be considered can document the proposed change, expected impact, required evidence updates, and justification where updates are not needed. Keeping evaluation and implementation on separate forms introduces risk of inconsistencies. A single, evolving document—kept in draft until implementation is complete—ensures alignment between assessment, evidence, and final outcome.
SW Tool Validation
Any software tool used in QMS processes or in design, development, or production must be evaluated and, where necessary, validated, before first use. Clauses 4.1.6 and 7.5.6 state that the “approach and activities associated with software validation and revalidation shall be proportionate to the risk associated with the use of the software.”
Given the wide range of tools in use today—from eQMS platforms to requirements tools to LLM-based systems—it is essential to have an effective, risk-based process.
We recently observed a case where software validation required full IQ, OQ, and PQ documentation for every tool, including separate test plans and reports, unless it could be argued that the tool had no impact on product or QMS processes. In practice, only one tool (an e-signature system) had been validated.
However, during an internal audit, multiple other tools were observed: SharePoint for CAPA tracking, Excel sheets with formulas for risk management, and a Git repository for source code. In each case, it was argued during the audit that the tool had no impact, but nothing was documented. This led to an unproductive and ultimately indefensible discussion.
Again, our preferred approach is a single record per tool, documenting its purpose, potential impact, and required controls. Simple checks can be applied—for example, if outputs are always verified downstream (e.g., through document review), additional validation may not be required. Where risks exist, targeted test cases can be defined proportionate to the risk. This approach ensures that validation effort scales appropriately while lowering the barrier to documenting tool usage. As a result, teams are less likely to bypass or hide tool usage, reducing both non-conformities and unknown risks.
Conclusion
Just as non-linear relationships between risk and regulatory burden can distort innovation at the regulatory level, a lack of risk proportionality in a company’s QMS can lead to wasted effort and compliance risks. ISO 13485 explicitly allows—and requires—a risk-based approach that aligns effort and evidence with actual risk. If a QMS does not fit the size and scope of the organization, it will both hamper innovation and lead to non-conformities, as teams are unable or unwilling to follow overly complex processes.
It is important for companies to be aware of this and to keep a lookout for certain indicators, such as processes that are not being followed, particularly in lower-risk situations. It includes teams looking for ways around a process or defining new processes, and situations where a lot of discussion focuses on artificial levels and classifications instead of actually discussing and documenting the ways a software tool, a purchased product, or a change can impact patient safety—and thus defining the appropriate control measures to mitigate that risk.
The same applies to splitting a process into many sequential steps that require separate records with different sign-off moments. These multi-step processes might be appropriate in large organizations, but often not for patient safety—rather to CYA in cases of interdepartmental friction. They have no place in smaller, more nimble organizations. Trying to implement overly heavy processes will not improve patient safety; it will instead hinder it, as it leads teams to work around the process.
At MD squared B.V., we work closely with both small and large companies to design QMS solutions that are not only compliant on paper but also practical and effective in daily use. We focus on aligning processes with real organizational needs, enabling teams to bring safe and effective devices to market efficiently.
Reach out if you are starting your MedTech journey and need support defining your regulatory strategy and QMS—or if you already have an established system but are facing the challenges described in this article.